Remanufacturing process and service

Automatic Transmission Rebuilders | B2B Rebuild Service for Automatic Units

Automatic transmission rebuilders rebuild automatic units through a system-level sequence that covers mechanical parts, hydraulic control, and electronic controls, finishing with a full-load dyno inspection of every unit.

BaseGuangzhou, China
Warranty describedAt least one year
Final check100% full-load dyno inspection, no sampling, per the documented process
  1. 1Teardown and screening
  2. 2Clean and renew
  3. 3Bench and dyno test
  4. 4Pack and ship

Before you place an order, confirm fitment, scope, and terms in writing.

Ask for a remanufacturing confirmationSee the 10-step process

Why automatic rebuilders need a system approach

An automatic transmission fault can originate in gears, in hydraulics, or in electronic controls, and the symptom alone rarely identifies the origin. A rebuilder that only addresses the mechanical parts leaves hydraulic and electronic faults in place, while a rebuilder that only replaces electronic parts leaves mechanical wear untouched. The documented process therefore screens mechanical core parts, cleans hydraulic parts, and bench tests solenoids, sensors, and valve body assemblies for oil flow, pressure stability, switching response, and sealing. The finished unit is then tested as a system under full load, covering main line oil pressure, clutch engagement, torque output, shift smoothness, working temperature, hydraulic condition, abnormal noise, and sealing. Business buyers should ask whether a provider tests at all three levels, mechanical, hydraulic, and electronic, or only at one.

The automatic rebuild sequence

The incoming automatic unit is inspected for housing cracks, structural damage, and severe internal faults, and only units that pass enter the process. Full teardown follows, with parts classified, registered, and numbered. Planetary gears, shafts, bearings, valve bodies, solenoids, and clutch assemblies are screened, and parts showing wear, deformation, fatigue, or out-of-tolerance measurements are scrapped. Reusable parts are ultrasonically cleaned in repeated cycles and checked again. Friction plates, steel plates, seals, gaskets, filters, thrust washers, and rubber parts are replaced, and upgrades are applied to known weak points in the original design. Pressing uses 20-ton hydraulic equipment, and worn valve bores are repaired with sleeves. Components are bench tested, housings are refurbished, and reassembly follows the original assembly method, torque parameters, and lubrication rules. Every finished unit is dyno tested under full load, with no sampling.

What business buyers should settle first

Business buyers should settle the model codes, the scope for each model, and the test coverage before discussing quantity. A scope that is correct for one automatic model may not be correct for another, because weak points and control layouts differ by model. Buyers should also settle how records are supplied: test data and a quality inspection record are retained for each finished unit in the documented process, and the buyer should confirm that the record for each unit in the order will be supplied with the order. Packing should be settled early where a destination or transport route imposes particular requirements, since export packing in fumigated solid wooden crates with shock and moisture protection is the documented standard, and any customisation should be agreed before dispatch.

Confirm before you order

Questions buyers ask

Do automatic rebuilders also handle continuously variable units?

Continuously variable units are a separate category on this site, handled as a remanufacturing service on their own page. Please confirm the category and the model code in writing, and do not assume that an automatic scope transfers to a continuously variable unit.

What is the most common cause of a repeat fault after a rebuild?

In general terms, repeat faults follow incomplete screening, incomplete cleaning, or an untested finished unit. The documented process addresses all three: strict screening with scrapping, ultrasonic cleaning with a second check, and a full-load dyno inspection of every finished unit. Ask a provider how each of these three points is handled.

How should a workshop buyer prepare for a rebuilt automatic unit?

Confirm the model code, confirm the scope and test record, and plan the delivery check: model code, appearance, sealing, and record, before fitting. Keep the packing until the check is complete.

Related pages

Remanufactured automatic transmission explains the process for automatic units. Transmission rebuilders is the general rebuild service page. Transmission dyno testing explains the final inspection.